AGMAC UPDATE

Phase I of the dredging the Acadiana Gulf of Mexico Access Channel (AGMAC) is ready to begin. The AGMAC would allow dredging of a 16-foot deep channel from the Port of Iberia to the Gulf of Mexico via the Intracoastal Canal. Contracts have been negotiated for the...

AGMAC Fall 2019 Update

The Port of Iberia is another step further in dredging the Acadiana Gulf of Mexico Access Channel (AGMAC). The AGMAC would allow dredging of a 16-foot deep channel from the Port of Iberia to the Gulf of Mexico via the Intracoastal Canal. Craig Romero, Port Executive...

AGMAC Update

Executive Director Craig Romero recently made a presentation to the Mississippi River Commission at a meeting in Houma, LA. during their annual low-water inspection trip. The Mississippi River Commission develops plans to improve the consideration of the Mississippi...

AGMC Update 2017

The Port of Iberia continues working toward the Acadiana Gulf of Mexico Access Channel. Craig Romero, Port Executive Director, recently met with the newly elected delegation to brief them on the AGMAC status and emphasis on its importance. “Between the Port and the...

AGMAC Update

The Port of Iberia recently secured $8.5 million from the State Bond Commission for the Acadiana Gulf of Mexico Access Channel. Craig F. Romero, Executive Director of the Port of Iberia stated, “Our state legislative delegation was very instrumental in securing this...